Flagged · UnverifiedTerre Haute Board of Public Works · Oct 26, 2026 · This meeting

Board approves widening the Fruitridge Avenue and Ohio intersection to ease backups

Verification status

Flagged — not yet verified. We have not been able to confirm part of this item against the record. We publish the flag rather than sit on the item; check the source yourself below.

Who it touches

Tracked in the archive

The Board of Public Works approved a request to improve the intersection of Fruitridge Avenue and Ohio, with curb work and a longer turn lane meant to make it safer for pedestrians heading to the nearby park. 0:04:16 — open the recording, cued to 4 minutes 16 seconds

Staff said this project covers only the widening and concrete work, with repaving to come later under the paving contract. 0:04:46 — open the recording, cued to 4 minutes 46 seconds

Speakers said the current left-turn lane is so short that cars stack up and back past Ohio, and a traffic study done last year had flagged this intersection. (5:28, 0:05:49 — open the recording, cued to 5 minutes 49 seconds

Asked about timing, staff said they would probably solicit bids soon and then put a contractor under contract; no start date was given. 0:06:55 — open the recording, cued to 6 minutes 55 seconds

More from the record

Outcome

Approved on a voice vote

Approved on a voice vote; no per-member tally was recorded. (6:40)

Project presented — cued to 0:04:16 (4 minutes 16 seconds)

This summary was drafted with AI assistance and reviewed by an editor against the recording and documents linked above. Nothing publishes without a resolvable source.